I’ve spent enough time around defense procurement discussions to notice a pattern. Someone mentions industrial capacity gaps. Someone else proposes a policy fix. Everyone nods. Meeting adjourns.
The problem never gets solved.
Here’s what I’ve learned: You cannot will a foundry into existence in 18 months. You cannot train a master pattern maker in a weekend course. The industrial base debate in Washington treats manufacturing capacity as a policy lever.
It is not.
It is a physical reality with decade-long lead times. The sooner we stop talking about it like a policy problem, the sooner we can make real progress.
The Numbers Don’t Lie About Our Capacity Crisis
The three largest US defense primes hold a combined backlog of $557 billion, equivalent to 2.7 times their 2025 annual sales. That represents an order coverage horizon of 30 months at current revenue run rates.
Meanwhile, it could take years to replenish stockpiles after recent conflicts.
This isn’t a planning failure. This is what happens when decades of underinvestment, slow production timelines, and unpredictable demand signals collide with the actual requirements of 21st-century warfare.
The disconnect is clear: Washington wants immediate results, but the current capacity of the U.S. defense industrial base is insufficient to meet the demands of modern warfare.
I see this pattern everywhere. Policy announcements about reshoring manufacturing. Subsidies for semiconductor fabs. Emergency funding for munitions production. All necessary. None sufficient.
Because they all ignore the fundamental constraint: building things takes time.
What Building a Foundry Actually Takes
Let me give you a concrete example. Waupaca Foundry completed two phases of design, engineering, construction and implementation within a condensed 26-month timeline. That was considered fast.
Brembo’s 266,000-square-foot iron casting facility in Homer, Michigan, celebrated its first pour in April 2016. The foundry began its ramp-up phase immediately after. By the beginning of the second quarter of 2018, it was running at full capacity.
Nearly two years just to reach full production. Not to break ground. Not to finish construction. To reach full operational capacity after the building was complete.
Foundry construction is a difficult challenge. Whether you’re building a completely new plant or adding onto an existing facility, obstacles come up that are both expected and surprising. Challenges stem from the distance between the company and the project, weather, construction delays, and other issues.
You cannot policy your way around concrete curing times or equipment commissioning.
I’ve worked in additive manufacturing long enough to know that even revolutionary technologies like our LAMP process at DDM Systems, which eliminates 7 of 12 traditional casting steps, still requires physical infrastructure, trained operators, and time to scale.
The physics doesn’t negotiate.
The Human Capital Problem Is Even Harder
Buildings are the easy part. You can accelerate construction with money and urgency. Human expertise? That’s different.
The skilled trades shortage reveals the impossibility of accelerated human capital development. Skilled trades require years of hands-on training through apprenticeships or trade schools. Becoming a licensed plumber or electrician can take four to five years of both classroom instruction and on-the-job experience.
An aspiring master craftsman would have to pass through the career chain from apprentice to journeyman before he could be elected to become a master. He would then have to produce a sum of money and a masterpiece.
Over 80% of contractors report difficulty filling hourly craft positions. The average age of skilled tradespeople has climbed past 55.
The traditional model of apprenticeship—learning under the wing of a master—has weakened, partly because fewer businesses have the capacity to train and mentor newcomers. As the older generation retires, they take with them decades of experience and craftsmanship that aren’t being passed down.
I see this in our own industry. The people who understand investment casting at the level required for aerospace and defense applications didn’t learn it from a textbook. They learned it over years of trial, error, and mentorship.
You can’t compress that timeline with policy.
Washington’s Measurement Problem
Here’s something that bothers me: While the Pentagon’s 2023 National Defense Industrial Strategy identifies supply-chain resilience as a national priority, Washington still lacks a basic performance metric for its own industrial base.
The Department of Defense does not use a single “readiness-per-dollar” measure for industrial-base investments. Readiness is tracked at the platform level, while industrial-base actions remain fragmented.
This reveals the fundamental disconnect. Policymakers optimize for political cycles, not manufacturing realities.
The real surprise in any conflict will be the factory that couldn’t deliver, not the plane that couldn’t fly. Modern warfare begins in the furnaces and finishing rooms of allied industrial bases, not at an airbase or seaport.
I’ve seen this firsthand. Our work on programs like the RS-25 rocket engine castings with Aerojet Rocketdyne or components for the USAF B-2 Spirit requires not just technical capability but sustained capacity.
Capacity you can’t create with an emergency appropriation.
The Consolidation We Never Reversed
The number of U.S. aerospace and defense prime contractors shrank from 51 to 5 since the early 1990s.
This consolidation wasn’t a strategic choice. It was the inevitable result of treating industrial capacity as fungible rather than physical.
Headlines remind us that our submarine fleet is shrinking by one boat every two years, and that manufacturing can’t keep up with need. You cannot will back three decades of lost manufacturing expertise with a press release.
Defense manufacturing employment fell by 2.1 million between 1985 and 2021, equivalent to about 40 percent of total manufacturing job losses over that period.
This isn’t a workforce planning problem that can be solved with a training program announcement. The slow process of training new workers means that even when there is interest in the trades, it takes years before these individuals are fully qualified to fill the vacancies left by retiring workers.
The industrial base is an ecosystem that took generations to build and has been systematically hollowed out.
Rebuilding requires the same generational commitment.
The Reality Check Nobody Wants to Hear
Despite all the industrial policy rhetoric, the actual US manufacturing sector has stagnated since 2022. Higher interest rates, continued materials inflation, worker availability, economic uncertainty, tariffs and trade disputes, onerous regulations—all contribute.
Capacity utilization moved up to 76.1 percent, a rate that is 3.3 percentage points below its long-run average.
The gap between announced investments and operational capacity reveals the core truth: building things takes time, and no amount of subsidy announcements changes the physics of construction or the decade-long apprenticeships required for mastery.
I work in an industry that’s trying to solve part of this problem. Our Digital Foundry approach delivers precision metal castings 10x faster at 50% lower cost than traditional methods. We’ve eliminated the upfront tooling investment that creates barriers to rapid production.
But even with technology that fundamentally changes the economics and timeline of casting, we can’t escape certain physical realities. Metal still needs to solidify. Operators still need training. Quality systems still require validation.
Technology can accelerate. It cannot eliminate time.
What Actually Works
I’m not arguing for despair. I’m arguing for honesty about timelines.
When we work with customers like GE Vernova or the U.S. Air Force, the conversations that lead to real progress start with realistic assessments. How long will qualification take? What’s the ramp timeline? Where are the constraint points?
The answers are never “immediately.”
What works:
Starting now, not when the crisis hits. Our $7M Digital Foundry installation at Tinker Air Force Base scheduled for 2026-27 represents planning that began years earlier. The $15M strategic partnership with Eaton for a Digital Foundry installation in the UK follows the same pattern.
Investing in dual-use capabilities. Technology that serves commercial and defense applications maintains expertise and capacity during peacetime. Our work spans aerospace, power generation, and industrial applications precisely because relying on defense-only demand creates brittleness.
Building incremental capacity continuously. Small, sustained investments in manufacturing capability compound over time. Waiting for a crisis and then trying to build everything at once guarantees failure.
Measuring what matters. Track time-to-first-article. Monitor supplier depth. Assess workforce age demographics. These metrics reveal industrial health better than contract awards.
Accepting longer timelines in planning. If a capability takes five years to build, you need to start planning seven years before you need it. The math is unforgiving.
The Conversation We Need to Have
I’ve sat in enough meetings where someone proposes solving an industrial capacity problem with a policy change or funding announcement. The room nods. Everyone feels productive.
Then nothing changes because the fundamental constraint wasn’t addressed.
We need a different conversation. One that starts with physical reality and works backward to policy, not the other way around.
How long does it actually take to build a foundry? Not how long would we like it to take. How long does it take.
How long does it actually take to train a master craftsman? Not how long a crash course runs. How long does mastery require.
How long does it actually take to qualify a new manufacturing process for aerospace applications? Not how long the paperwork takes. How long does validation require.
The answers to these questions don’t care about political timelines or budget cycles or strategic imperatives.
They care about physics, metallurgy, human learning, and time.
Until we build policy around these constraints rather than pretending they don’t exist, we’ll continue to have the same frustrated conversations about industrial capacity.
The industrial base isn’t a policy problem. It’s a physics problem. And physics doesn’t negotiate.
The sooner we accept that, the sooner we can start building the capacity we’ll need a decade from now.
Because that’s how long it takes.
Continue your research: Explore Investment Casting Services. Related articles: The Industrial Base We Incentivized and The Foundry Problem Nobody’s Talking About. For production capabilities, see Rapid Precision Castings capability statement. For more detail, read the Solving the Defense Supply Chain Crisis white paper.
From industrial-base analysis to executable scope
Evaluate the casting path behind the supply-chain issue
Connect the industrial-base problem to the specific geometry, alloy, qualification, sustainment, and supplier-capacity decisions required for an actual casting program.